Acta Auriga

Acta Auriga

DP2 W2W CSOV

Show specifications

Introducing
Acta Auriga

This Construction Support Vessel operates seamlessly in up to 3.0-metre significant wave heights. Its optimized hull ensures unmatched workability and a comfortable stay on board, even in rough weather.

Your benefits

Motion Compensated Gangway

The SMST gangway facilitates safe personnel transfers in significant wave heights up to 3.0 metres.

3D Compensated Crane

Acta Auriga’s 3D-motion compensated knuckle boom crane lifts cargo safely and efficiently.

Large Deck Space

The vessel provides 500 m² indoor and 500 m² weather deck cargo space (24 TEUs).

Acta Auriga impression

A smart hotel
experience

All accommodation areas are designed with the principle that well-rested personnel are more productive.

Acta Auriga has 80 cabins providing DNV Comfort Class level 2 accommodation for up to 120 people.

Download the latest spec sheet


    A smart hotel
    experience

    All accommodation areas are designed with the principle that well-rested personnel are more productive.

    Acta Auriga has 80 cabins providing DNV Comfort Class level 2 accommodation for up to 120 people.

    Acta Auriga specifications

    Classification / Flag

    Type: DP2 Construction Support vessel
    Delivery: April 2018
    Flag: Dutch
    Classification: DNV-GL +1A SF, E0, Offshore Service Vessel, Walk2Work, Strengthened (DK, HA), DYNPOS (AUTR), CLEAN (DE-SIGN), COMF(C-2, V-2), NAUT(OC), BWM(T), BIS, SPS 2008.
    Autonomy: approx. 30 days

    Main Dimensions

    Length O.A: 93.4 m
    Breadth moulded: 18.0 m
    Depth moulded: 7.6 m
    Draught design: 5.6 m
    GRT: 6050 mT
    Deadweight @ design draught: 2600 mT
    Weather deck (Deck A) area: 500 m2
    Main Deck area: 500 m2
    Weather deck (Deck A) max load: 250 mT
    Main Deck max load: 650 mT

    Download the latest spec sheet


      Recent Acta Auriga projects

      borssele, acta centaurus, acta marine projects, commissioning, construction supportProjectBorssele: Supporting the whole lifecycle of Offshore Wind Farms
      July 20, 2020

      Borssele: Supporting the whole lifecycle of Offshore Wind Farms

      Borssele: Supporting the whole lifecycle of Offshore Wind Farms 20 July 2020  | Reading time 2 minutes This slogan we use from time to time in the media to emphasize…
      Merkur, meg 1, acta construction, deme group, acta orion projectProjectMerkur (MEG 1) Offshore Wind Farm Construction Support
      April 9, 2018

      Merkur (MEG 1) Offshore Wind Farm Construction Support

      Merkur (MEG 1) Offshore Wind Farm Construction Support 9 April 2018  |  Reading time 2 minutes The Acta Orion assisted DEME Group subsidiary Tideway with its cable pull-in, testing and…