Skip to main content

Acta Marine contracted CIG Shipbuilding to build Wind Farm Support Vessel

By February 4, 2015November 8th, 2024News

Home » Acta Marine contracted CIG Shipbuilding to build Wind Farm Support Vessel

Acta Marine contracted CIG Shipbuilding to build Wind Farm Support Vessel

| Reading time 3 minutes

Acta Marine contracted CIG Shipbuilding for the design and construction of a large Wind Farm Support Vessel. The DP-2 fitted vessel measures 108 by 16 meters and offers comfortable accommodation and workspace for 75 persons onboard.

The vessel will be equipped with two dedicated boat landings for Crew Transfer Vessels as well as a motion-compensated gangway, which allows a safe and efficient transfer of technicians and equipment between the vessel and wind turbines. CIG has optimized the design with the aim of creating a vessel with the best possible workability and comfort for operations in heavier sea state conditions, applicable for wind farms that are built further offshore.

The vessel will be named ‘Acta Orion’ and is scheduled for delivery in September 2015. The hull is currently under construction in Poland and outfitting will take place in the north of the Netherlands. Immediately after delivery, the vessel will be chartered by contractor Van Oord, who will use Acta Orion during the construction of the Gemini Offshore Wind Farm that will be located 85 km offshore in the Dutch part of the North Sea.

The new Acta Orion will be the largest unit in the fleet of Acta Marine. In the coming months, Acta Marine plans to make further investments for the offshore wind market by adding Crew Transfer Vessels to the fleet.

Want to know more?
Get in touch.

Give us a callOr send us an email
Acta Pegasus in the fieldNewsActa Marine Reinforces Long Term Commitment to France with French Flagging of Acta Pegasus
May 7, 2026

Acta Marine Reinforces Long Term Commitment to France with French Flagging of Acta Pegasus

Acta Marine Reinforces Long Term Commitment to France with French Flagging of Acta Pegasus May 7, 2026 | Reading time 2 minutes Rotterdam, the Netherlands / Montoir-de-Bretagne, France — Acta…
Acta Hercules deliveredNewsSecond CSOV Acta Hercules delivered to Acta Marine
March 25, 2026

Second CSOV Acta Hercules delivered to Acta Marine

Second CSOV Acta Hercules Delivered to Acta Marine March 24, 2026 | Reading time 2 minutes Rotterdam, the Netherlands / Montoir-de-Bretagne, France – Acta Marine proudly announces the delivery of…