Contact us directly +31 (0)88 03 20 900

Anchor handling at a Pipelay Barge

After operating with a Pipelay Barge for a period of six weeks, the Coastal Assistant set sail from Gambia to Douala in Cameroon.


Here the Multicat Eurocarrier 2009 assisted during the construction of pipes and an accommodation pontoon. This project was executed for an international player in the Oil & Gas industry.


These projects had a duration of four months, were completed in 2014, and consisted of: assistance during the construction of pipelines and an accommodation pontoon.

Related vessels